Humber College Cultural Hub
Client
The Humber College Institute of Technology & Advanced Learning
Region
Toronto, ON
Area Office
Toronto
Size
350, 000 sq. ft.
Sector
Buildings
Sub-Sector
Education (Institutional)
The Story
The Humber College Cultural Hub (HCH) project has transformed the Lakeshore campus into an epicenter of academic and cultural activity. This educational facility encompasses a remarkable 350,000 sq. ft, blending cutting-edge arts and multimedia education with community engagement.
Academic Advancements in Arts and Technology: The HCH added around 200,000 sq. ft of specialized academic space to Humber College's repertoire, enhancing access to top-tier training in the arts and culture sectors. It’s a new home for award-winning music and creative arts programs and the Centre for Creative Business Innovation, which synergizes artistic vision with business strategies to advance Canada's creative landscape.
State-of-the-Art Creative Amenities: The hub's completion introduced a suite of high-caliber facilities:
- A state-of-the-art recording studio, dynamic performance spaces, and dedicated practice rooms.
- Film studios, music labs, and editing suites, all built to cater to the intricacies of modern media production.
- The construction required meticulous planning to ensure the unique spaces met the project's complex demands.
Premiere Venues for Artistic Expression: The HCH now features technologically enriched teaching and performance venues, including:
- A 600-seat performance hall, serving as a grand stage for a wide array of events.
- A 150-seat recital hall, offering an intimate setting for performances and lectures.
- Professionally equipped studios for music, film, television, and design production.
Enhancing Community and Economic Vibrancy: With the addition of the HCH, Humber College expanded its capacity to nurture talent for the booming creative industry. The project has been a catalyst for business growth, job creation, and economic development, while also enriching local cultural experiences.
Sustainable Development for Future Generations: A new 300-bed student residence was also part of the completed development, consolidating the HCH's status as a comprehensive educational ecosystem. The project achieved its goal of LEED Platinum certification, proudly standing as a net-zero carbon facility and a model of sustainable design.
Project Milestones:
- Phase 1 Handover: In August 2024, EllisDon proudly handed over Phase 1 of the HCH, marking a significant milestone in the project's timeline.
- Phase 2 Completion: With a target set for December 2026, the completion of Phase 2 is eagerly anticipated, promising to further elevate the HCH's offerings and impact.